Print

Forming is the first process in a thermoforming cycle. The sheet material, be it PET or PP, is softened by applying heat in order to be able to get the shape of the designed final product by stretching and sticking to a surface by applying vacuum.

The moulds are made of special aluminum alloy to provide fast cooling with the aid of circulating water around the exterior chamber of forming cavity.    

3D modelling of the moulds with necessary shrinking tolerances allready applied thanks to our expertise and experienceare are then passed and processed on CNC Milling Machines with utmost precision. 

When designing the thermoforming mould

Şekilleme Gözü

Standard Product Dimensions

When giving the external dimensions to a design European and American Standard packing boxes are taken into consideration. The final product should fit inside these standard boxes appropriately.  
Even customer gives an intermediate height product or design of a certain product family, Yeteka checks the market standard sizes and designs the mould with the maximum depth cavity, and with the height inserts to provide the requested depths of customer. The mould is delivered to customer ready to adopt the maximum depth easily. 

Azami Şekilleme Derinliğne Göre Tasarım

 

Each Forming Cavity in an Independent Unit!

 When manufacturing moulds capable of using for producing variable depths of final product, the mould is not processed on a single metal block. Eventough this approach increases the cost and workmanship, customer's benefit is considered and each cavity of forming station is manufactured from separate pieces. Different depths of the same product group are achieved with the aid of inserts. (In the figure above for a product depth / height of 105, 75 and 58 mm H105, H75 and H58 inserts are given respectively. Thanks to this feature customer customer does not need to buy and store one forming mould for different heightsjust needs to order inserts to have variable heights of products from a single forming station. On the other hand this feature also decreases the costs for renowation / maintenance in case of a physical damage in any of the forming cavities during it's entire service life.
  

Change the Height Even Without Uninstalling the Thermoforming Mould from Machine!

To shift from one height to another can be achieved just in 5 - 10 minutes of time; neither take the mould out from the forming stations fixing table, nor uninstall the mould in to it's components.
Insert Değişim Vidaları


İşçilikten Tasarruf Daha az Enerji